FACTORY
1 | Design & Engineering
Being vertically integrated, the R&D design team works in conjunction with the factory engineering team to optimize the HW design for the best into manufacturing process. SKED is utilizing modern manufacturing management tools, ERP and Shop Floor Control System, to ensure processes are strictly followed, as well as components & production traceability.
2 | NPI & Products pre-certifications
3 | Testing
I.Q.C. tests
Covering the whole chain after Internal homologation and 3rd party labs:
- Industrialization on the line
- Sampling Per AQL(ANSI/ASQC/Z1-4)
- RoHS
- Electronic Characteristic
- Dimensions
- Artwork Verification
- Cosmetics
- Assembly Verification
- Packing/Labels
X-RAY Soldering Control
- Utilize X-Ray for BGA and through-hole soldering control
- Soldering paste thickness monitoring for consistent quality
- Periodic cleaning of soldering stencil for consistent quality
- Periodic monitoring of reflow oven temperatures for consistent quality
- Strictly follow PCBA operational standards, IPC-610D
I.P.Q.C. tests
- First Article Inspection
- SOP/Process Confirmation
- Soldering Paste Thickness Measurement
- AOI
- X-Ray Inspection
- Oven Temp. Monitoring
- Air-driver Torque Monitoring
- Soldering Iron Temp. Monitoring
PCBA Quality Control
- First Article Inspection
- PCBA Visual Appearance Inspection following IPC-610D Standards
- Shortage Test
- Voltage Test
- Full Functional Test With Jig and PTC Station
- All with operators fully ESD protected with LED WARNING at distance
Quality Assurance (Q.A.)
- Documents Validation and Confirmation
- First Article Inspection
- Sampling Per AQL(ANSI/ASQC/Z1-4)
- Full Functional Test
- Cosmetics Inspection
- Burning Test
- Vibration & Drop Test
- Thermal Shock Test
- Customer Buy-off Inspection
- Container Inspection
4 | TRACEABILITY
- Utilize SFCS (Shop Floor Control System) for Material and Production Traceability
- Material Date Codes Are Recorded for each Production Lot
- PCBA’s and STB’s Are Traced by Serial Number and Recorded for each Production Lot
- All Tests Are Recorded and Must Be Performed in Predefined Sequence
- All Tests Must Be Completed and Pass Before A STB Can Be Shipped.
5 | SUPPLY CHAIN & MANUFACTURING
Matured and sound supply chain system enables us to not only guarantee high quality and cost efficient solutions. Being Vertical integrated allows VERY FAST TIME TO MARKET as well as SHORT CYCLE TIME from PO to delivery.
Customer Service, CBU Logistic, CKD Kitting and SKD support are part of our strength.
6 | After sales support
On top of the FIELD SUPPORT, factory also address the customer complains, responding to achieve customer satisfaction:
- Customer Complain Collection
- Investigation & Analysis
- 8D Reports Compiling and Share to Customer
- 8D Reports Internal Implementation
- Validation for Internal Implementation
- Confirmation of Case Close from Customer